The goal of the first day’s operation is to collaborate with Cutsforth and identify any adjustments required to help ensure that the Unit Status indicators and thresholds are set to the optimum starting levels for your generator. Follow the procedures below the first time your generator is placed in service following initial installation.

The first time your generator is placed in service following initial installation, follow this procedure:

  1. Download and print out the procedure attached to this article.

  2. Fill out the sheet with the observed values.

  3. Follow additional instructions on the sheet for downloading waveforms.

  4. Save the sheet and the waveforms for future reference.

Was this article helpful?
0 out of 0 found this helpful