Responsibilities |
Cutsforth |
Plant |
---|---|---|
Provide shaft growth value at grounding location |
|
|
Indicate shaft rotation direction |
|
|
Review planning guide document |
|
|
Determine enclosure mounting position and conduit routes customized to the generator and ensure it is within system guidelines |
|
|
Mount enclosure(s) and install required conduit |
|
|
Ensure the shaft is off turn gear and stationary |
|
|
Ensure the shaft is fully coupled |
|
|
Ensure the bearing caps immediately adjacent to the shaft grounding area are in place |
|
|
LOTO requirements: Main excitation system, ground detection system, and turning gear |
|
|
Provide 120V GFI protected power |
|
|
Provide adequate working access to installation site including scaffolding |
|
|
Install Cutsforth shaft assembly |
|
|
Provide welding support |
|
|
Run wiring in completed conduit raceways |
|
|
System wiring terminations not including grounding termination to generator case |
|
|
Identify main grounding termination point on the unit case |
|
|
Electrical support to make ground terminations |
|
|
System testing and commissioning |
|
|
Control room support for testing 4-20mA outputs if connecting to DCS |
|