The following reference topics provide detailed technical information on the capabilities and legal information pertaining to the Assurance Monitoring System.
-
Average voltages and currents are calculated on the samples taken during each snapshot as the sum of (x)/N, where x is the array of samples acquired, and N is the number of samples.
-
Zero-to-peak voltages and currents are calculated on the samples taken during each 0.02-second period by the following formula:
-
Longer-term averages are calculated by accumulating averages for the specified period. They are then reset in preparation for the next calculation. The formula used is as follows:
Document Name |
Document Number |
---|---|
Shaft Grounding System Operations Manual |
Series 1: EZDP-2007 Series 2: EZDP-2035 Series 3: EZDP-2068 |
Assurance Monitoring System Installation Planning Guide |
EZDP-2126 |
Assurance Monitoring System Wiring Diagram |
Refer to product part number (e.g., EGMA-320) |