Visually Inspect and Clean Premium Monitoring System Electrical Components

PM Need: Required  

Frequency: Annually  

Action: Using a compressed-air duster approved for electronics, blow all dust and debris off the electrical components inside the Premium Monitoring System.

Check Current Sensor, Voltage Sensor, and System Performance

Calibration Need: Advised  

Frequency: Annually, as outage schedule permits, or if measurements suggest readings are inaccurate.

Was this article helpful?
0 out of 0 found this helpful