Visually Inspect and Clean Premium Monitoring System Electrical Components
PM Need: Required
Frequency: Annually
Action: Using a compressed-air duster approved for electronics, blow all dust and debris off the electrical components inside the Premium Monitoring System.
Check Current Sensor, Voltage Sensor, and System Performance
Calibration Need: Advised
Frequency: Annually, as outage schedule permits, or if measurements suggest readings are inaccurate.