This manual covers the installation and operation of the Cutsforth Remote Meter Point.
The following parts are included in the Remote Meter Point and Assurance Monitoring System installation packages:
|
|
|
1 Junction box Part number: EGMA-202 |
1 Remote Meter Point Part number: EGMA-203 OR 1 Assurance Monitoring System Part number: EGMA-301 |
-
Welder, TIG preferred (for Shaft Grounding Assembly only)
-
1/2 in hex wrench socket
-
9/16 in socket wrench
-
1/4 in hex key wrench
-
3/16 in hex key wrench
-
Drill
-
5/16 in-18 tap
-
Letter F drill bit
-
Wire cutters
-
Wire strippers
-
Wire crimpers
-
Tape, banding, and/or clamps (for Shaft Grounding Assembly only)
-
The shaft must be fully coupled.
-
The generator and turbine bearing caps in the load compartment must be fully installed.
-
The condition of the shaft at the Shaft Grounding Assembly installation location must be documented by photo or video. If the shaft is still rotating, use a strobe to capture a video of the shaft condition. To facilitate a robust electrical contact for the shaft grounding system, make sure that the shaft surface is free of grooving, pitting, oxidation, and contamination.