This manual describes the installation of the Cutsforth Shaft Grounding Assembly. 

Components

The following parts are included in the Shaft Grounding Assembly installation package:

1 Shaft Grounding Assembly

Part # EGSA-210

2035_4_1_A.svg

2 Shaft grounding ropes

Part # EGHK-205

2035_4_1_B.svg

1 Attachment arm pipe

Part # EGSM-012

2035_4_1C.svg

1 Rope guide spacer (1/16 in thick)

2035_4_1_D.svg

2 Elbow assemblies

Part # EGSA-004

2035_4_1E.svg

1 Connector plate and hardware

Part # EGSM-009

2035_4_1F.svg

1 High-Frequency Drain Kit

Part # EGSA-303

2035_4_1_G.svg

Required Tools

  • Welder, TIG preferred (for Shaft Grounding Assembly only)

  • 1/2 in hex wrench socket

  • 9/16 in socket wrench

  • 1/4 in hex key wrench

  • 3/16 in hex key wrench

  • Drill

  • 5/16 in-18 tap

  • Letter F drill bit

  • Wire cutters

  • Wire strippers

  • Wire crimpers

  • Tape, banding, and/or clamps (for Shaft Grounding Assembly only)

Installation Prerequisites

  • The shaft must be fully coupled.

  • The generator and turbine bearing caps in the load compartment must be fully installed.

  • The condition of the shaft at the Shaft Grounding Assembly installation location must be documented by photo or video. If the shaft is still rotating, use a strobe to capture a video of the shaft condition. To facilitate a robust electrical contact for the shaft grounding system, make sure that the shaft surface is free of grooving, pitting, oxidation, and contamination.