This manual is a guide for planning the installation of the Cutsforth Generator Field Monitoring System (GFM). Review the documentation for the original or OEM shaft grounding system for planning the removal of that system.

Note

This manual does not cover all details or variations in equipment, nor does it consider every possible contingency for installation, operation, or maintenance. If you have questions or concerns that are not addressed in this manual, contact Cutsforth Engineering Support.