Related Products:

EGSA-210, EGSK-201, EGSK-301

Related Documents:

EZDP-2035

Type:

Installation

Keywords/Labels:

Shaft Grounding, Maintenance

Summary:

Describes how to change out the ground and metering rope with replacements.

Installing and Removing the Shaft Grounding Rope

This topic describes the installation and removal of the Shaft Grounding Rope.

The ground rope (left) is connected to the 8 AWG ground conductor.

schematic-wco.png

NOTE

When changing ropes online, always have one rope installed in the Rope Guide Assembly to maintain proper ground.

In the following figure, the bold paths show the flow of ground current depending on the ropes installed.

grounding-diagram-2.png

Removing a Rope

  1. Lift the rope grip by the handle tab (A), and then pull the rope away from the shaft (B).

    2035_7_2_1A.svg
    2035_7_2_1B.svg
  2. Continue pulling the rope away from the Rope Guide Assembly (C), while maintaining control of the rope until it has been completely removed.

    2035_7_2_2-01.svg

Inserting a Rope

  1. Insert the rope into the rope guide (A), as shown in the following figure.

    2035_7_1_1.svg
  2. With the rope fully inserted into the rope guide, push down on the rope grip (B) until it is fully seated in the Rope Guide Assembly (C).

    2035_7_1_2A.svg
    2035_7_1_2B.svg

Do you need more help?

Submit your questions or requests using the Support Ticket Submission form.

Was this article helpful?
0 out of 0 found this helpful