Related Products: |
EGSA-210, EGSK-201, EGSK-301 |
Related Documents: |
EZDP-2035 |
Type: |
Installation |
Keywords/Labels: |
Shaft Grounding, Inspection |
Summary: |
Considerations to be used in inspecting the Shaft Grounding Assembly for wear or contaminants. |
To ensure that the Shaft Grounding Assembly is in proper working condition, make the following inspections frequently:
-
Check for any cracking or breakage of components
-
When installing or removing the rope, check the “snap in” pressure .
-
Confirm that the rope guide is not contacting the shaft. There should be approximately 1/16 in between rope guide and the face of the shaft.
-
Inspect the integrity of the rope guide and attachment arms.
-
Inspect the shaft condition for any visible signs of wear, pitting, grooving, contaminants, and so forth.
-
Inspect ropes for wear and contaminants.
Submit your questions or requests using the Support Ticket Submission form.