Related Products: |
EZBA-001 |
Related Documents: |
EZDP-2016 |
Type: |
Installation |
Keywords/Labels: |
Quality Control |
Summary: |
Sign off on this Quality Control Hold List during key parts of the Brush Holder installation process to ensure correct installation and safety. |
QC Hold Point |
Cutsforth Lead Person |
---|---|
QC Hold 1: Confirm the unit is de-energized. |
_________________ |
QC Hold 2: Confirm the brush position is at speed. |
_________________ |
QC Hold 3: Confirm the megohmmeter reading is less than 1.12 megohms. |
_________________ |
QC Hold 4: Confirm 120 in lb (13.5 Nm) torque. |
_________________ |
QC Hold 5: Confirm the position of the brushes on the first and second yokes. |
_________________ |
QC Hold 6: Confirm 240 in lb (27.5 Nm) torque. |
_________________ |
QC Hold 7: Confirm the megohmmeter reading is less than 10 megohms. |
_________________ |
QC Hold 8: Confirm the brush shunt orientation. |
_________________ |
QC Hold 9: Confirm the proper brush rigging operation. |
_________________ |