Related Products:

EZBA-001

Related Documents:

EZDP-2016

Type:

Installation

Keywords/Labels:

Quality Control

Summary:

Sign off on this Quality Control Hold List during key parts of the Brush Holder installation process to ensure correct installation and safety.

Quality Control Hold List

QC Hold Point

Cutsforth Lead Person

 

QC Hold 1: Confirm the unit is de-energized.

 

_________________

 

QC Hold 2: Confirm the brush position is at speed.

 

_________________

 

QC Hold 3: Confirm the megohmmeter reading is less than 1.12 megohms.

 

_________________

 

QC Hold 4: Confirm 120 in lb (13.5 Nm) torque.

 

_________________

 

QC Hold 5: Confirm the position of the brushes on the first and second yokes.

 

_________________

 

QC Hold 6: Confirm 240 in lb (27.5 Nm) torque.

 

_________________

 

QC Hold 7: Confirm the megohmmeter reading is less than 10 megohms.

 

_________________

 

QC Hold 8: Confirm the brush shunt orientation.

 

_________________

 

QC Hold 9: Confirm the proper brush rigging operation.

 

_________________

Do you need more help?

Was this article helpful?
0 out of 0 found this helpful