Related Products: |
EGSA-013, EGSA-017 |
Related Documents: |
EZDP-2007 |
Type: |
Installation |
Keywords/Labels: |
Shaft Grounding, Installation |
Summary: |
Procedure for installing the rope grounding kit. |
-
Open the rope holder by pulling the handle back, and remove the set screw using a 1/4 in hex key wrench.
-
Insert the rope into the rope slot .
-
Insert the rope terminal onto the terminal mount rib.
-
Secure the rope in position by tightening the set screw to 72-96 In-lbs (8-11 N-m).