Related Products: |
EGSA-013, EGSA-017 |
Related Documents: |
EZDP-2007 |
Type: |
Installation |
Keywords/Labels: |
Shaft Grounding, Installation |
Summary: |
Procedure for installing the rope holders and verifying the installation. |
-
Start installing the rope holder into the grounding system by inserting the copper rope into the rope guide .
-
Once the copper rope has been inserted into the rope guide, align the holder with the grooves on the sides of the mount and slide the holder into the mount.
-
Rotate and lock the handle into place while applying pressure toward the shaft. The position of the rope holder mount is set at the factory. Verify that the rope holder is approximately 1/8 in from the surface of the shaft.
-
Attach the female connector at the end of the grounding rope signal wire to the corresponding male banana jack .
This table shows a correctly and an incorrectly installed rope holder:
This table shows a correctly and an incorrectly mounted rope holder:
Table 2. Correct/Incorrect Mounted Rope Holders
Correct |
Incorrect |
---|---|
In this example, the terminal and holder are properly engaged: |
In this example, the rope holder is not fully engaged: In this example, the terminal is disengaged: |
When you have completed the replacement, flip the switch located below the rope holders back to "Metering" or "Run" mode: