Related Products:

EGSA-210, EGSK-201, EGSK-301, EGSA-013, EGSA-017

Related Documents:

EZDP-2035, EZDP-2007

Type:

Installation

Keywords/Labels:

Shaft Grounding, Prerequisites

Summary:

Details regarding the tools necessary to complete the Shaft Grounding Assembly installation.

Required Tools

  • Welder, TIG preferred (for Shaft Grounding Assembly only)

  • 1/2 in hex wrench socket

  • 9/16 in socket wrench

  • 1/4 in hex key wrench

  • 3/16 in hex key wrench

  • Drill

  • 5/16 in-18 tap

  • Letter F drill bit

  • Wire cutters

  • Wire strippers

  • Wire crimpers

  • Tape, banding, and/or clamps (for Shaft Grounding Assembly only)

Do you need more help?

Submit your questions or requests using the Support Ticket Submission form.

Was this article helpful?
0 out of 0 found this helpful