The following table summarizes the Plant's responsibilities for getting ready for the service phase.

Preparation for Service Phase

NOTE

The responsibilities listed in the following table are critical to technician safety and proper installation of the Cutsforth equipment. Failure to comply may result in significant delays and additional charges.

Task

Cutsforth

Plant

Mount assurance enclosure(s) with supporting strut channel rails and install required conduit.

LOTO the following components: Main excitation system, ground detection system, and turning gear.

Provide 120 V GFI protected power for general use during installation.

Provide adequate working access to installation site including scaffolding.

Ensure that the shaft is off turning gear and stationary.

Ensure that the shaft is fully coupled for installation .

Ensure that the bearing caps immediately adjacent to the shaft grounding area are in place.