Related Products:

EGSK-301, EGMA-301, EGSK-201, EGMA-203

Related Documents:

EZDP-2041, EZDP-2046

Type:

Installation

Keywords/Labels:

Assurance Monitoring, Remote Meter Point, Installation

Summary:

Mounting requirements, location information, and maximum cable run lengths for the junction box and enclosures.

Placement of Enclosures

This article covers the placement and mounting requirements for the junction box and the Remote Meter Point or Assurance Monitoring System enclosure.

Junction Box (EGMA-202)

The junction box A requires one strut channel rail B. The junction box receives cable from the rope guide assembly.

2041_6_2_1.svg

Remote Meter Point (EGMA-203) or Assurance Monitoring System (EGMA-301)

Do you need more help?

Was this article helpful?
0 out of 0 found this helpful