Related Products: |
EGSK-301, EGMA-301, EGSK-201, EGMA-203 |
Related Documents: |
EZDP-2041, EZDP-2046 |
Type: |
Installation |
Keywords/Labels: |
Assurance Monitoring, Remote Meter Point, Installation |
Summary: |
Mounting requirements, location information, and maximum cable run lengths for the junction box and enclosures. |
This article covers the placement and mounting requirements for the junction box and the Remote Meter Point or Assurance Monitoring System enclosure.
The junction box A requires one strut channel rail B. The junction box receives cable from the rope guide assembly.