Related Products:

EGSK-301, EGMA-301, EGSK-201, EGMA 203

Related Documents:

EZDP-2041, EZDP-2046

Type:

Installation

Keywords/Labels:

Assurance Monitoring, Remote Meter Point, Installation, Diagram

Summary:

Diagram showing the high-level installation steps.

Installation Overview

install-ov-2046-425px.png

  1. Mount the junction box circle-a.png and the Remote Meter Point or Assurance Monitoring System enclosurecircle-b.png.

  2. Connect the signal cables to the junction box circle-c.png and the Remote Meter Point or Assurance Monitoring System circle-d.png.

  3. Connect the ground cables to unit case ground circle-e.png.

Do you need more help?

Was this article helpful?
0 out of 0 found this helpful