Planning Guide |
Keywords/Labels: |
Assurance Monitoring, Project Phase |
Summary: |
The following table summarizes the responsibilities of Cutsforth and the Plant during the service phase. |
Task |
Cutsforth |
Plant |
---|---|---|
Provide shaft growth value at grounding location to Cutsforth technician. |
✔ |
|
Indicate shaft rotation direction to Cutsforth technician. |
✔ |
|
Install Cutsforth shaft assembly. |
✔ |
|
Provide welding for support arm. |
✔ |
|
Install junction box. |
✔ |
|
Run wiring in plant-completed conduit raceways. |
✔ |
|
Make system wiring terminations, not including grounding termination to generator case. |
✔ |
|
Identify main grounding termination point on the unit case. |
✔ |
|
Provide electrical support to assist in making ground terminations. |
✔ |
✔ |
Perform system testing and commissioning. |
✔ |
|
If connecting to DCS, provide control room support for testing 4–20 mA outputs. |
✔ |
✔ |
Submit your questions or requests using the Support Ticket Submission form.